CS 240 Climbing scaffold

CS 240 is a crane-dependent climbing system, ideal for use as a load-bearing scaffold or as a working and safety scaffold.

It is versatile and can be adapted to different wall types and heights, including inclined walls up to 30°. The CS 240 climbing scaffold with retractable formwork, available in two different versions: either as CS 240 L for use with wall formwork with through ties in concreting position or as CS 240 H for use on inclined walls up to 30°.

Videos & photos

By activating the video you accept the YouTube privacy policy.
To the privacy policy

Attention: You have deactivated JavaScript in your browser and can therefore not see all contents.

Sibiu Bridge Romania: learn more about this colossal infrastructure project

Using CS 240 climbing formwork to raise floors.

2

Product advantages

Work safely

  • 3-part railing protection ensures that all platforms are safe
  • Safe relocation of the climbing platform in four predefined  steps
  • Pull protection during relocation is ensured

Work productively

  • High adaptability and load-carrying capacity for various applications
  • Usable with both frame panel or timber beam wall formwork
  • Suitable for great heights of more than 100 m
  • CS 240 H is usable on inclined walls up to 30°.
  • Pre-assembled climbing scaffold units based on project requirements, arriving ready to use on-site.
  • Fast and efficient final assembly of accessories on site
  • Formwork can be pushed back from the concrete using a travel unit.

Technical data

CS 240 L Climbing scaffold

           

Platform widths

Working platform 2.40 m | Trailing platform 2.02 m | Pouring platform 0.82 m

         

Maximum formwork height

5.40 m

         

Clearance from concrete

Up to 83 cm

         

Relevant standards

Load-bearing scaffold accord. to EN 12811 | Working and safety scaffolds accord. to EN 12811 part 1

         

Influence width per CS brackets

With 4 m formwork height, up to 4.75 m (depending on wind load)

         

Handling

Crane

         

Formwork

MANTO | H 20 wall formwork | PLATINUM 100

         

Application above ground

Up to 100 m and higher (accord. to static calculation)

         
             

CS 240 H Climbing scaffold

           

Platform widths

Working platform = 2.60 m | Trailing platform = 2.02 m | Pouring platform = 1.30 m

         

Maximum formwork height

5.40 m

         

Clearance from concrete

Up to 95 cm

         

Relevant standards

Load-bearing scaffolds according to EN 12811 | Working and safety scaffolds according to EN 12811 part 1

         

Influence width per CS brackets

With 4 m formwork height, up to 4.75 m (depending on wind load)

         

Handling

Crane

         

Application above ground

Up to 100 m and higher (accord. to static calculation)

         

Max. formwork height for use as dam bracket

3.90 m (accord. to static calculation)

         

Inclined walls

Up to ± 30° (accord. to static calculation)

         